Sunday, October 12, 2014

More scaffolding uses












So, as you will know from the movie 'The great escape' one of the biggest issues in digging is where to put the spoil. Luckily we had no need to maintain secrecy and created our molehill in plain sight. As we have dug out the space under the house we have expanded the field area in terraces out front between us and the river. With the digging in 2013 I needed more stone to hold up the terraces that would be formed with all the spoil, so I built a scaffolding rail system for a little trundle to haul large stones up from the river using the electric winch again.
Sammy did a huge amount of work shifting stones up one by one and also in a bucket suspended from a rope, but I didn't want to break him, so this seemed like a good solution. There was still a lot of work involved in dragging in rocks from further afield as they grew scarce at the railhead, but the vertical shift was achieved by the railway. I had to make some special fitments at the joints to allow the rollers to ride over them smoothly. I think I used six three meter lengths of scaffolding, so the winch wire was at its limit.





The tipping bucket is separate from the carriage, there are a couple of cleats on the front face, a square bar is slotted between them, then the whole bucket is heaved over sideways to dump out the rocks while remaining on the carriage if possible. The little blue rag taped to the rail is there as a marker to show the winch operator down by the stream where to stop.
The actual digging took a while, but I seem to have neglected to take any pictures of the progress in that.
The same system came in useful for building another concrete delivery chute down to the workshop from the road when it came to forming the retaining walls for the new digging.