Friday, May 25, 2007

Site frame


All went well with the door frame fitting despite the rain and we finished in a couple of hours, so about a six hour round trip all in, getting home around noon. I was on a bottle crate doing the business most of the time while Sammy handily passed up bits and bobs. He drove back, which was handy, too. The Job site wasn't far on enough to warrant taking the window frame in the end, it would just have been in their way until they get the interior walls done. So I have that in the shop for a while and I can make up the window itself as I get on to the door and other stuff.
Charcoal on cartridge 37x53cm