Monday, May 28, 2012

Bricks



We bought in some floor bricks and I spent a couple of evening sessions laying the edges on the right here, then on Sunday and today we put in the rest. Still a gap here and there, but a lot more homely with a floor to walk on and there is a lot brighter feel to the space. The trestle table is a temporary addition which we hope to use for a lacquering job. The dome seems to have the ideal qualities for lacquer drying, high humidity and warm temperatures.
The door frame is now set up temporarily at one end of the shop to check how it looks so that I can make some adjustments before I apply the copper cladding. Not a representative picture through the lens yet, so I will hold fire on posting until I have one.